A: If you have drawings, welcome to share drawings with us, quoation will be done based your drawings. Our excellent design team will design the steel structure workshop warehouse for you. If you give the following information, we will give you an satisfactory drawing.
1. Location (where will be built? ) which country? which city?
2. Size: Length*width* Eave height _____mm*_____mm*_____mm.
3. wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s.
4. snow load (max. Snow height) _____kn/m2, _____mm, temperature range?
5. anti-earthquake _____level.
6. brickwall needed or not If yes, 1.2m high or 1.5m high? or other?
7. thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8. door quantity & size _____units, _____(width)mm*_____(height)mm.
9. window quanity & size _____units, _____(width)mm*_____(height)mm.
10. crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m.
Q2: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Qingdao Jiaozhou Airport, then we will pick you up at the airport.
Q3:ls your price competitive compared with other companies?
A:Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
Q4:Do you accept container loading inspection?
A:You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5:Do you offer designing service for us?
A:Yes, we could design full solution drawings as your requirements.By using AutoCAD ,PKPM ,3D3S,Tekla Structures (X steel) etc., we can design complex industrial building like office mansion, super marker, auto dealer shop,shipping mall, 5 stars hotel.
Q6: What is the delivery time?
A:Delivery time depends on order quantities. ln general, the delivery time to nearest seaport in China will be 30 days after receiving deposit.